Site Safety Audit Report
| Client | Ridge Line Builders, LLC (SAMPLE — fictional) |
|---|---|
| Site | Cedar Ridge Retail Shell (SAMPLE — fictional project) |
| Site address | 2500 Demonstration Drive, West Valley City, UT 84119 |
| Industry | Construction (OSHA 29 CFR 1926) |
| Audit date | November 12, 2026 |
| Report date | November 19, 2026 |
| Prepared by | Pat Morgan, Utah Safety Consultant |
| Quote / agreement no. | Q-2026-014 (sample) |
1. Executive summary
Ridge Line Builders is building a one-story retail shell at a fictional West Valley City site. On the day of the visit, crews were setting roof sheathing on the west wing, running temporary power, and excavating for a utility tap along the north property line. The superintendent walked the site and made records available in the job trailer.
Overall assessment: Needs improvement. Housekeeping in the trailer and the designated crane swing area were in good order, and workers were wearing hard hats, glasses, and hi-vis. Two High findings need to be controlled before work continues in those areas: unprotected roof work on the west wing, and an excavation about 6 feet deep with no protective system and workers in the trench. Temporary power, a damaged extension cord, and gaps in the OSHA 300A posting and SDS access should be corrected on a short timeline.
Top three actions: (1) stop west-roof work until fall protection is in place; (2) get workers out of the north utility trench and install a protective system before anyone re-enters; (3) put temporary power on GFCI and remove the damaged cord from service.
| Items checked | Deficiencies | High | Medium | Low | Records gaps |
|---|---|---|---|---|---|
| 42 | 7 | 2 | 3 | 2 | 2 |
2. Site information
| Client contact | Jordan Blake, Superintendent (fictional) |
|---|---|
| Operations observed | Roof sheathing, temporary power, utility excavation, material handling with a telehandler, general carpentry |
| Approx. employees on site | 18 (prime and two subcontractors) |
| Conditions | Clear, light wind, mid-40s °F, day shift |
| Persons interviewed | 6 employees (voluntary, confidential; no names in this report) |
3. Scope and standards reviewed
Scope per sample quote Q-2026-014: the Cedar Ridge Retail Shell site only, day shift, construction operations and records as they existed on November 12, 2026. Standards reviewed: OSHA 29 CFR 1926 and applicable 29 CFR 1910 / 1904. This is an advisory review, not an OSHA inspection, and it cannot identify every hazard.
4. Findings
| ID | Finding | Location | Standard | Risk | Photo | Corrective action | Owner | Due |
|---|---|---|---|---|---|---|---|---|
| F-01 | Two carpenters setting sheathing about 16 ft above grade with no guardrails, net, or personal fall arrest. No roof anchors were visible. | West roof, Building A, south side, 11:20 a.m. | 29 CFR 1926.501(b)(1) | High | P-01 | Stop roof work until a fall-protection system is in place (guardrails, net, or PFAS with rated anchors). Inspect gear before use. | Superintendent | Before work resumes on that roof |
| F-02 | Utility trench about 6 ft deep, no sloping, benching, shoring, or shield. Two workers in the trench. Spoil piled at the edge. No ladder in the trench. | North property line, utility tap, 10:05 a.m. | 29 CFR 1926.652(a)(1); 1926.651(c)(2); 1926.651(j)(2) | High | P-02 | Remove workers from the trench. Install a protective system designed for the soil, keep spoils at least 2 ft back, and provide a ladder within 25 ft. Competent person to inspect before re-entry. | Superintendent / excavation competent person | Immediate — before anyone re-enters |
| F-03 | Spider box for the west-side saws plugged into a permanent receptacle with no GFCI. One cord had a repaired splice wrapped in electrical tape. | West side, temporary power | 29 CFR 1926.404(b)(1); 1926.405(g)(2) | Medium | P-03 | Place the circuit on GFCI (or an assured equipment grounding conductor program). Remove the damaged cord from service immediately. | Site electrician | Cord: immediate. GFCI: 7 days |
| F-04 | Telehandler backup alarm did not sound during a reverse movement in the laydown yard. Operator was wearing a seat belt; travel area was otherwise clear at the time. | South laydown yard | 29 CFR 1926.602(a)(9) | Medium | P-04 | Tag the unit out until the alarm is repaired and tested. Remind operators not to use equipment with a defective safety device. | Equipment manager | Before the unit is used again |
| F-05 | Monthly fire-extinguisher inspection not initialed for November. Access was clear; gauges were in the green. | Job trailer and west work area | 29 CFR 1926.150(a)(4) | Medium | — | Inspect and initial all extinguishers, and set a monthly reminder. | Superintendent | 7 days, then monthly |
| F-06 | SDS binder locked in the job-trailer office. Afternoon-shift workers said they would have to wait for the superintendent to look one up. | Job trailer | 29 CFR 1910.1200(g)(8) (via 1926.59) | Low | — | Keep SDS available on every shift (unlocked binder or equivalent electronic access). | Superintendent | 14 days |
| F-07 | Current-year OSHA 300A summary was completed but not posted in a conspicuous place. It was in a file folder in the trailer. | Job trailer records | 29 CFR 1904.32 | Low | — | Post the 300A in a conspicuous place from February 1 through April 30 (and keep it with the logs for 5 years). | Superintendent | Immediate (report month is inside the posting window in this sample) |
Photo references P-01 through P-04 would appear here in a live report, under each finding, from pictures taken in the app. This sample does not include photographs.
5. Records review
| Record | Result | Notes |
|---|---|---|
| Written site-specific safety plan | OK | Present in the trailer; last revised at project start. |
| OSHA 300 / 300A / 301 (5 years) | Deficient | Logs present; 300A not posted (F-07). |
| Training records | OK | Orientation and fall-protection training on file for prime crews; subcontractor roof crew training was in a separate binder and complete. |
| Inspection logs | Deficient | Extinguisher monthly check missing for November (F-05). Ladder inspections current. |
| HazCom / SDS | Deficient | Program and chemical list present; SDS not accessible on every shift (F-06). |
| Incident files | OK | Two first-aid cases this year, reports complete. |
| Citations / insurer reports | N/A | Client stated none for this project. |
6. Interviews (summary)
Six voluntary, confidential interviews (carpenters, a laborer, a telehandler operator, and a subcontractor roofer). Workers could name the superintendent as the person to go to with a safety concern. Several knew where first aid and extinguishers were. Two afternoon-shift workers said they could not get an SDS without the superintendent. The excavation crew could not name a trench-protective system for the north tap and said they “were only going to be in there a minute.” Those points line up with F-02 and F-06.
7. Prioritized action plan
- Immediate: Fall protection on the west roof (F-01). Trench protective system, spoils, and egress (F-02). Remove the damaged cord (F-03). Tag out the telehandler until the alarm is repaired (F-04). Post the 300A (F-07).
- Within 7 days: GFCI or AEGCP on temporary power (F-03). Extinguisher inspections (F-05).
- Within 14 days: SDS access on every shift (F-06).
A follow-up call is offered 2–5 business days after this report is sent. A verification visit for the High items, or help writing any missing procedure, would be a separate quote if the client wants it.
8. Closing meeting
Held November 12, 2026, about 3:15 p.m., with Jordan Blake, Superintendent. High findings were discussed on the spot earlier in the day: roof work was stopped and the trench was vacated before the close-out. Report due date of November 19 confirmed. Sample acknowledgement signed in the app (fictional).
Prepared by: Pat Morgan, Utah Safety Consultant. This sample is for training only. It is not a report on a real employer or workplace.