Sample audit report — construction

A completed report with findings, risk ratings, and corrective actions. Every name and site here is fictional and clearly marked SAMPLE.

Use: Read this once before your first job so you know what “done” looks like. Live reports are built in the app (Step 8) from your field entries.

Back to Field Guide
Utah Safety Consultant
Safety consulting: construction, mining & heavy equipment, trucking
Salt Lake City, UT 84103
435-901-9601
Mon–Fri 9:00 AM – 5:00 PM

Site Safety Audit Report

ClientRidge Line Builders, LLC (SAMPLE — fictional)
SiteCedar Ridge Retail Shell (SAMPLE — fictional project)
Site address2500 Demonstration Drive, West Valley City, UT 84119
IndustryConstruction (OSHA 29 CFR 1926)
Audit dateNovember 12, 2026
Report dateNovember 19, 2026
Prepared byPat Morgan, Utah Safety Consultant
Quote / agreement no.Q-2026-014 (sample)

1. Executive summary

Ridge Line Builders is building a one-story retail shell at a fictional West Valley City site. On the day of the visit, crews were setting roof sheathing on the west wing, running temporary power, and excavating for a utility tap along the north property line. The superintendent walked the site and made records available in the job trailer.

Overall assessment: Needs improvement. Housekeeping in the trailer and the designated crane swing area were in good order, and workers were wearing hard hats, glasses, and hi-vis. Two High findings need to be controlled before work continues in those areas: unprotected roof work on the west wing, and an excavation about 6 feet deep with no protective system and workers in the trench. Temporary power, a damaged extension cord, and gaps in the OSHA 300A posting and SDS access should be corrected on a short timeline.

Top three actions: (1) stop west-roof work until fall protection is in place; (2) get workers out of the north utility trench and install a protective system before anyone re-enters; (3) put temporary power on GFCI and remove the damaged cord from service.

Items checkedDeficienciesHighMediumLowRecords gaps
4272322

2. Site information

Client contactJordan Blake, Superintendent (fictional)
Operations observedRoof sheathing, temporary power, utility excavation, material handling with a telehandler, general carpentry
Approx. employees on site18 (prime and two subcontractors)
ConditionsClear, light wind, mid-40s °F, day shift
Persons interviewed6 employees (voluntary, confidential; no names in this report)

3. Scope and standards reviewed

Scope per sample quote Q-2026-014: the Cedar Ridge Retail Shell site only, day shift, construction operations and records as they existed on November 12, 2026. Standards reviewed: OSHA 29 CFR 1926 and applicable 29 CFR 1910 / 1904. This is an advisory review, not an OSHA inspection, and it cannot identify every hazard.

4. Findings

IDFindingLocationStandardRiskPhotoCorrective actionOwnerDue
F-01 Two carpenters setting sheathing about 16 ft above grade with no guardrails, net, or personal fall arrest. No roof anchors were visible. West roof, Building A, south side, 11:20 a.m. 29 CFR 1926.501(b)(1) High P-01 Stop roof work until a fall-protection system is in place (guardrails, net, or PFAS with rated anchors). Inspect gear before use. Superintendent Before work resumes on that roof
F-02 Utility trench about 6 ft deep, no sloping, benching, shoring, or shield. Two workers in the trench. Spoil piled at the edge. No ladder in the trench. North property line, utility tap, 10:05 a.m. 29 CFR 1926.652(a)(1); 1926.651(c)(2); 1926.651(j)(2) High P-02 Remove workers from the trench. Install a protective system designed for the soil, keep spoils at least 2 ft back, and provide a ladder within 25 ft. Competent person to inspect before re-entry. Superintendent / excavation competent person Immediate — before anyone re-enters
F-03 Spider box for the west-side saws plugged into a permanent receptacle with no GFCI. One cord had a repaired splice wrapped in electrical tape. West side, temporary power 29 CFR 1926.404(b)(1); 1926.405(g)(2) Medium P-03 Place the circuit on GFCI (or an assured equipment grounding conductor program). Remove the damaged cord from service immediately. Site electrician Cord: immediate. GFCI: 7 days
F-04 Telehandler backup alarm did not sound during a reverse movement in the laydown yard. Operator was wearing a seat belt; travel area was otherwise clear at the time. South laydown yard 29 CFR 1926.602(a)(9) Medium P-04 Tag the unit out until the alarm is repaired and tested. Remind operators not to use equipment with a defective safety device. Equipment manager Before the unit is used again
F-05 Monthly fire-extinguisher inspection not initialed for November. Access was clear; gauges were in the green. Job trailer and west work area 29 CFR 1926.150(a)(4) Medium — Inspect and initial all extinguishers, and set a monthly reminder. Superintendent 7 days, then monthly
F-06 SDS binder locked in the job-trailer office. Afternoon-shift workers said they would have to wait for the superintendent to look one up. Job trailer 29 CFR 1910.1200(g)(8) (via 1926.59) Low — Keep SDS available on every shift (unlocked binder or equivalent electronic access). Superintendent 14 days
F-07 Current-year OSHA 300A summary was completed but not posted in a conspicuous place. It was in a file folder in the trailer. Job trailer records 29 CFR 1904.32 Low — Post the 300A in a conspicuous place from February 1 through April 30 (and keep it with the logs for 5 years). Superintendent Immediate (report month is inside the posting window in this sample)

Photo references P-01 through P-04 would appear here in a live report, under each finding, from pictures taken in the app. This sample does not include photographs.

5. Records review

RecordResultNotes
Written site-specific safety planOKPresent in the trailer; last revised at project start.
OSHA 300 / 300A / 301 (5 years)DeficientLogs present; 300A not posted (F-07).
Training recordsOKOrientation and fall-protection training on file for prime crews; subcontractor roof crew training was in a separate binder and complete.
Inspection logsDeficientExtinguisher monthly check missing for November (F-05). Ladder inspections current.
HazCom / SDSDeficientProgram and chemical list present; SDS not accessible on every shift (F-06).
Incident filesOKTwo first-aid cases this year, reports complete.
Citations / insurer reportsN/AClient stated none for this project.

6. Interviews (summary)

Six voluntary, confidential interviews (carpenters, a laborer, a telehandler operator, and a subcontractor roofer). Workers could name the superintendent as the person to go to with a safety concern. Several knew where first aid and extinguishers were. Two afternoon-shift workers said they could not get an SDS without the superintendent. The excavation crew could not name a trench-protective system for the north tap and said they “were only going to be in there a minute.” Those points line up with F-02 and F-06.

7. Prioritized action plan

  1. Immediate: Fall protection on the west roof (F-01). Trench protective system, spoils, and egress (F-02). Remove the damaged cord (F-03). Tag out the telehandler until the alarm is repaired (F-04). Post the 300A (F-07).
  2. Within 7 days: GFCI or AEGCP on temporary power (F-03). Extinguisher inspections (F-05).
  3. Within 14 days: SDS access on every shift (F-06).

A follow-up call is offered 2–5 business days after this report is sent. A verification visit for the High items, or help writing any missing procedure, would be a separate quote if the client wants it.

8. Closing meeting

Held November 12, 2026, about 3:15 p.m., with Jordan Blake, Superintendent. High findings were discussed on the spot earlier in the day: roof work was stopped and the trench was vacated before the close-out. Report due date of November 19 confirmed. Sample acknowledgement signed in the app (fictional).

Prepared by: Pat Morgan, Utah Safety Consultant. This sample is for training only. It is not a report on a real employer or workplace.